MOD Super Fast Pizza, a fast-growing and expending company, enlisted PSCG to complete an extensive interior remodel for their new headquarters in Bellevue, WA. The project included the complete demolition of 20,000 sq. ft. of office space, a creative open ceiling plan, custom furniture, iron work, and a high-quality three zone daylight savings package. […]

Westfield Capital Mall
Commercial
During Westfield Capital Mall’s 120,000 sq. ft. exterior remodel, PSCG was one of the multiple construction contractors utilized to accommodate the client’s accelerated timeline. PSCG completed a detailed EIFS system around Century Theater entrance, one of the leading commercial-grade STUCCO systems.
Quinault Resort and Casino
Commercial
A 140,000 sq. ft. extensive exterior remodel of Quilnalt Beach Resort & Casino in Ocean Shores, WA was conducted in seven stages. The $2.5 million project included custom products for the ocean front such as salt-water engineered materials. Custom native art work was created based on the design drawings of the local native artist and […]

Panera Bread
Commercial
Panera Bread, a bakery and café chain with locations in 40 states, utilized PSCG for installation of corporate-specified new specialty coating of Synergy CBS1000 STUCCO system at their Shoreline, WA location. The project was conducted within a tight timeframe including necessary weather protection such as scaffolding and shrink-wrap, to insure proper application of […]
Market Court Condominium
Commercial
Market Court Condominiums, located by Market Place in Seattle, WA and overlooking Puget Sound, utilized PSCG for a 49,000 sq. ft. exterior remodel. Since the project was located on the busy street with many pedestrians, safety was a top priority during application of the cement board CBS1000 STUCCO system.
Bel Mar
Commercial
The recently-opened BELMAR store in Bellevue, WA was converted from carwash into an upscale retail space. PSCG coordinated the interior and exterior remodel including installation of an elaborate security system. At the cost of $600,000, this location is the first of four that PSCG will be constructing in the near future.
Holiday Inn Express | Olympia, WA
Commercial
PSCG managed multiple locations for the same owner during the new construction of the Holiday Inn located in Olympia, WA. The project included construction of a new exterior Cladding System (STUCCO). Due to work being conducted during the winter months, weather protection such as scaffolding and shrink-wrap was necessary for the proper completion of […]
Global Trading Resource Corp. Office
Commercial
Global Trading Resource Corp. utilized PSCG to take the 18,000 sq. ft. building shell and convert it to an upscale office space. This extensive project included new commercial-grade STUCCO system on the exterior and exotic custom woodwork and stone work on the interior.

Candlewood Suites
Commercial
Candlewood Suites in Olympia, WA, owned by the same owner of Holiday Inn, utilized PSCG to complete a new exterior Cladding System (STUCCO). Since this project was also being conducted during the winter months, a similar weather-protection system was installed to protect the workers and job site from the elements.
Holiday Inn Express Sumner
Commercial
PSCG, utilized as a general contractor, took on the extensive exterior upgrade of Holiday Inn in Sumner, WA. Since the hotel was in operation during the installation of the NICHIHA stone overlay system, it took the close cooperation of the staff and building crew to minimize the effect of the construction work on the customers.